Large Scale Chimney Fabrication

L/E/F were awarded the contract to fabricate 4 new chimneys for the power station at the Sullom Voe Terminal Power Station.

Our large facility was the most suitable and cost effective place on the Island which allowed us to fabricate a structure of this size inside a quality controlled enviroment. All 4 chimneys were fully blasted and Thermal Metal Sprayed on site. They were delivered and installed by our team and the contract was completed on time and in budget.

This project demonstrates that LEF can carry out a full turnkey project including fabrication, coating, inspection and installation cost effectively.